Get in Touch

Gurugram

Emaar Digital Greens, B 908,
Baharampur Naya, Sector 61,
Gurugram, Ghata, Haryana 122002

Mumbai

Idea square
2nd floor, Idea Square, b-42, Off New Link Rd,Veera Desai Industrial Estate, Andheri West, Mumbai, Maharashtra 400053

Dubai

Al Jahra Building –
504 Al Waleed Rd – Dubai

Phone

0124-4823181

Email

hello@saffronnetworks.in

Follow us

Request a quote

Network Infrastructre For A Telecom Major

Additional image

Objectives

1.Create a Robust Network for a large telecom corporate office in Gurgaon for over 5000 users sitting space.
2.Prepare a complete LAN infrastructure with DC and all Active Networking components.
3.Seamless user connectivity to achieve productivity and user experience.
4.Crucial Delivery timelines 45 days to live 5000 users setup.

Solutions

  • BOQ is designed to make a cost effective and sustainable solution which can guarantee reliability and performance.
  • Passive components selected with Belden with CAT6 A for wireless and CAT6 for LAN connectivity all DC were set up with Rittal smart racks.
  • Cisco selected Core Networks and Collaboration including IP telephony ,Board room and Video conferencing.

At A Glance

Challenges

  • To create a comprehensive connectivity architecture to match the need of a modern enterprise. 
  • Strict completion timelines.

Activities

1. Site surveys – Physical walk through to understand the site and its challenges.
2.Requirement gathering – Understand the expectation in terms of bandwidth ,Performance and reliability of the solution.
3.Heat map surveys with Ekahau.
4.Prepare pre-project plan with dedicated Active and Passive team in place to execute installation and configurations.
5.Testing – Panta scanning and Wireless testing

Outcome

1. Seamless user connectivity: Extensive surveys for better wireless connectivity and to reduce interference with best in class tools and physical testing helped out to reach the best possible wireless connectivity at the site.
2. Performance and Reliability: Brand selection played a major role to achieve the objective of the most reliable and productive solution to support the user expectation resulting in zero down the latency and improved productivity.
3.Timely Project completion: Project completion timeline was so crucial and the Partner required to be flexible enough to work on the same pace as the project plan goes which was again achieved with the prime objective of the client.